Guildford Aquatic Centre

Surrey, BC

Mehrdad Jahangiri:
Project Engineer/Manager while at Fast + Epp Structural Engineers

Andrew Chad:
Truss and connection design at Fast + Epp Structural Engineers

These custom fabricated timber trusses form the center piece of the Guildford Aquatic Center. These ~27m long trusses (including 4m sections of roof) were prefabricated, and fully finished offsite which allowed for a several weeks schedule saving as compared with a traditional steel roof. Scope included the specialty design of the hybrid LSL/Glulam trusses, their connections to base building and design of built-up plywood roof structure.

Photos 1-5 by Kimber Images


ArchitectRevery Architecture | SHAPE ArchitectureStatusCompleted 2014