Vancouver, BC
Mehrdad Jahangiri:
Project Engineer/Manager while at Fast + Epp Stuctural Engineers
Demolition of the existing building, renovation of the existing gymnasium and a new 105,000 sq. ft. two-storey school structure, comprised of a concrete suspended transfer slab, and a mixture of steel and timber framing at the second floor level.
All photos by Kimber Images
ArchitectThinkspace Architecture (GHMA)StatusCompleted 2014